DiQuisto ADU

DiQuisto Herron Morton ADU | Carriage House Conversion
Location Indianapolis, Indiana
Size 560 sq ft
Status Construction Scheduled Winter 2026

Designed to keep extended family close when visiting from out of town, this project transforms an empty second-floor carriage house into a fully livable Accessory Dwelling Unit. Located in the historic Herron Morton neighborhood, the interior fit-out optimizes the existing 560-square-foot footprint situated above a detached garage into a comfortable 1-bedroom, 1-bath layout. The thoughtful conversion creates an inviting, private, and self-contained living space tailored for guest stays.


(next project)

Net-Zero Shipping Container Tiny Home

Previous
Previous

Caye Residence

Next
Next

Net-Zero Shipping Container Tiny Home